DIY: LED Deck

by TanYA on Friday, March 19th, 2010
Email Email

Light up your deck and impress your family and friends. This whole project only took about 1 1/2 days to complete.  The first day to install the wiring and flexible LED lights, and the second to connect the controllers and go over the strips with clear silicon for extra protection.  Details here.



*Products reviewed may be available from the links provided. Please do not call Bedzine for these products as we do not carry them.

Tags: , ,

Related News and Resources

Leave a Reply



If you like this post, then please subscribe to Bedzine RSS.

You can also subscribe by E-mail by entering your name and E-mail below:

Name: Email:

Featured Sites from Zedomax Blog Network



115 queries. 0.7230 seconds.